STADE OMNISPORT DE LIMBE-LOT3

MANAGEMENT OF PARKINGS INCLUDING INTERNAL WAYS

Vue du palier 5 du parking ouest du stade de Limbe

 

CONSTRUCTION PROJECT FOR THE ACCESS AND BYPASS ROADS AROUND THE LIMBE OMNISPORT STADIUM – LOT 3: DEVELOPMENT OF PARKING LOTS INCLUDING INTERNAL ROADS

 

The project delivered the construction of two parking lots (East and West) covering a total area of 77,095 m², equipped with a drainage network (gutters and curbs) as well as horizontal and vertical traffic signaling. These parking lots have a capacity to accommodate 2,500 vehicles.

The pavement structure was constructed with a pozzolana sub-base layer, a 0/31.5 mm crushed stone base course, and a double-layer surface dressing sealing.

 

Best Wordpress Gallery Plugin